Scale Model Shop

Collapse

B-17G Flying Fortress 'Miss Demeanor' 1/48 Monogram

Collapse
This topic is closed.
X
X
 
  • Time
  • Show
Clear All
new posts
  • Guest

    #46
    coming along really nice buddy :beer2:

    Martin

    Comment

    • flyjoe180
      SMF Supporters
      • Jan 2012
      • 12400
      • Joe
      • Earth

      #47
      I saw a forum discussing your build Trey, must be the bloke for whom you are building this one. Quite the conversation about the staggered windows and other things, you definitely have your work cut out.

      Comment

      • mossiepilot
        SMF Supporters
        • Jul 2011
        • 2272

        #48
        Looking cracking Trey. The IP is very impressive, and the rest of the office is a detail fest.

        Looking forward to more.

        Tony.

        Comment

        • Guest

          #49
          Usual top standard mate, nice job.

          Andy

          Comment

          • Guest

            #50
            Thanks for the kind words Fellas! Joe you're right thats the Bloke! Great news no staggered windows on this version ,so I dodged some major surgery!Even though this area wo'nt be seen in great detail once its entombed I could'nt just leave it as is. First I cut away this clunky blob of what ca'nt even be identifed and replaced the hole with some sheet styrene

            Then after cutting down the kit supplied front table it was painted and glued in along with the support leg made from a standard wood toothpick

            Next up was building the radio stack. I finally found a use for the resin mold bases,after some sanding they turned into suitable replacent boxes for the equipment.

            Added some details and painted it

            Finally installed

            Comment

            • flyjoe180
              SMF Supporters
              • Jan 2012
              • 12400
              • Joe
              • Earth

              #51
              Superb stuff Trey.

              Comment

              • Guest

                #52
                Thanks Joe! My apologies for the delays in updates, I took a break to go to Daytona for some Moto racing and now its back to the build!

                I've been ordered to open the bomb bays so broke out the razor saw. The Verlinden update set included some nice brass doors with some rib detail added.

                I had to adjust the nav/radio seat and desk position to a more 'scale' size and location

                Then added some more radio detail and gave it a light wash to perk it up

                Waist gun areas up next ,more True detail resin. The kit details removed with a dremel and the parts fit right in.

                More nose detail added and more yet to come,the small resin bits to the left will be the bomb sight eventually

                Comment

                • Guest

                  #53
                  All I can say is WOW. Cheers Derek

                  Comment

                  • AlanG
                    • Dec 2008
                    • 6296

                    #54
                    Honestly Trey i consider your work as a peice of art. As always you are making a masterpeice

                    Comment

                    • papa 695
                      Moderator
                      • May 2011
                      • 22770

                      #55
                      Thats looking awsome already Trey great work mate

                      Comment

                      • Guest

                        #56
                        Fantastic work so far... nothing less to expect from you

                        Comment

                        • spanner570
                          SMF Supporters
                          • May 2009
                          • 15402

                          #57
                          Brilliant stuff Trey. One mega build for sure!

                          Ron

                          Comment

                          • Guest

                            #58
                            That's coming together nicely, a lot of work going into this can't wait to see the finished aircraft

                            Comment

                            • Guest

                              #59
                              Another stunning bit of work. Amazing detail Trey. Keep it coming mate.

                              Andy

                              Comment

                              • colin m
                                Moderator
                                • Dec 2008
                                • 8750
                                • Colin
                                • Stafford, UK

                                #60
                                I don't know where the order to open up the bomb bay came from, but he or she is quite right. So much detail cannot be hidden by a couple of doors - it would be a crime !

                                Comment

                                Working...