That is an awesome start, can't wait to see this develop.
blown bridge dio
Collapse
This topic is closed.
X
X
-
Guest
-
Here are some photos showing semaphore signal control wires and point rodding, you don't need to consider the rodding though. These cables run from signal boxes alongside the track on pulley wheels mounted on short metal stakes to a semaphore signal post remote from the SB.
[ATTACH]115031.IPB[/ATTACH]
[ATTACH]115032.IPB[/ATTACH]
[ATTACH]115033.IPB[/ATTACH]
On the bench: Airfix 1/48 Sea King HC4, Revell 1/24 Trabant.
Coming soon: Airfix 1/72 Phantom FGR2.
Just finished: Airfix 1/48 Stuka & Airfix 1/72 Sea King HC4.Comment
-
Thanks for photos of tracks
PART TWO
have built whole bridge and have destroyed it , let me know what you think i have split the lower beam since taking picks and i think there is to many timbers on ground even though i left some off the built bridge .
please give me your thoughts.
thanks[ATTACH]115069.IPB[/ATTACH]
[ATTACH]115070.IPB[/ATTACH]
[ATTACH]115071.IPB[/ATTACH]
[ATTACH]115072.IPB[/ATTACH]
[ATTACH]115073.IPB[/ATTACH]
Comment
Comment