That is a cracking man cave.
Sheds
Collapse
X
-
-
Guest
Andy, does the storage area need all the insulation, OSB etc?
If not, have you thought about building two sheds. One for modelling built at top spec, and one as a lean to off of it for storage only. Decent quality, but without all the bells and whistles..could bring your budget under control.....
Plus, if I need more workspace in the future I could remove the internal partition wall and spread out into the storage section.
Roof will be 6x2 so I can have a proper cold roof system with 100mm PIR, 50mm(ish) ventilation gap, 18mm OSB, then EPDM.
The hardest bit is getting all of that inside permitted development rules of 2.5m max height while still keeping plenty of headroom!Comment
-
I'd go the extra bit of time and build bigger even if it costs more but that said you could always build a workshop and buy a prefab to cohabit the same space?Comment
-
Guest
Firstly James, sorry that I've gatecrashed your topic. I'll start my own if I ever get around to building!
That is one option I've considered though - tarting up my current shed / hobby room for storage, then building a new workshop. Trouble is the house has been extended 4 times so I don't want to take up too much more of the garden. I have so many different layouts on the go it's hard to decide. My Sketchup looks like a medieval village :smiling5:
John - probably 18mm yes. Many seem to use 11mm, but for the extra few quid I might as well go thicker.
As for the floor, with the popularity of living Sedum roofs I thought it might be nice to build straight onto the grass and have a living floor. Might be a bit tight to swing the mower around mind.
Joking of course, I've put more thought into the floor/base than anything else. If I stick to the 8' width I can use my existing base of 2x2 slabs on a compacted MOT / sand base. It hasn't moved in over 10 years so I think I did it right. That would allow me to use weedy floor joists as they'll have plenty of support, giving better headroom inside, but probably propped up on cross bearers to give some airflow underneath. The supplier I'm looking at does tanalised C24 at not much more than regular timber, so would probably go for that throughout.
Going wider opens a whole new can of worms. I won't go into that as I've already taken up too much of James' space :smiling4:Comment
-
Ha ha no worries, it's a shed topic for all and this is heavily shed based chat so.no worries for meComment
-
So instead of modelling I decided to wire up some temporary lights (run from an extension in house but ready for mains connection when I get cable run and tested).
Also altered my stash storage today which is now wall mounted.
Tomorrow job is to remove wheels from tool chest, put under bench where compressor is and then eBay compressor.
Also need to modify welding bench so new small silent compressor will go under it.Comment
-
-
Guest
I like the lights, nice and low profile rather than the chunky ones I keep banging my head on!
Also really like the "exposed" wiring. I see many people burying it in the walls, but for me it's a shed, and it'll be much easier to add fittings or swap things around in the future if you've gone for the trunking approach.
Really getting jealous now.... :smiling5:Comment
-
I like the lights, nice and low profile rather than the chunky ones I keep banging my head on!
Also really like the "exposed" wiring. I see many people burying it in the walls, but for me it's a shed, and it'll be much easier to add fittings or swap things around in the future if you've gone for the trunking approach.
Really getting jealous now.... :smiling5:
I considered doing the wiring behind the boarding but went for trunking, as you said it's easier to make changes if needed.Comment
-
-
So decided to make inroads into the modelling corner today. Cladding walls and below shelves to neaten it up and then add battening for custom paint storage to maximise space and get rid of my pre made racks.
Also going to add some mirroring to further improve light in the area.Comment
-
So a child free day meant productivity was maximise. Mess hadn't been cleared and it's not complete but is 85% there......Comment
Comment