Scale Model Shop

Collapse

Centurion AVLB (slow build)

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • JR
    • May 2015
    • 18273

    #226
    Originally posted by Scratchbuilder
    The plan is to have the bridge workable so that I can put it on display in the launched position. The reason for this was when I displayed my Chieftain bridgelayer the bridge is fixed in the half-way point and I was like an expectant father all day wondering if someone had damaged it. But when stored in the display cabinet it will be in the transport position.
    Wibble .Hope you are going to park as near as you can to those damned steps at St Ives .Can't see it being easy to carry ! Suppose it will be many journeys as usual :smiling3:

    Wobble .

    Comment

    • Scratchbuilder
      • Jul 2022
      • 2689

      #227
      Originally posted by Jakko
      Hahaha! :smiling3: The real thing spans a fourteen-metre gap, give or take …

      Got the video already - play - pause - zoom in - repeat, got a lot of info from this video.

      Comment

      • Scratchbuilder
        • Jul 2022
        • 2689

        #228
        Originally posted by John Race
        Wibble .Hope you are going to park as near as you can to those damned steps at St Ives .Can't see it being easy to carry ! Suppose it will be many journeys as usual :smiling3:

        Wobble .
        Wobble,
        Not to panic, it may even not get finished in time, still got the base to do, but cannot do that untill it is finished. But I know there is a holiday around that time so may not even make it. First holiday in years - what do you do, do I still need to take a bucket and spade, do they give free boat rides. is it share a hotel with new friends.....
        Wibble...

        Comment

        • Scratchbuilder
          • Jul 2022
          • 2689

          #229
          Thanks for the comments, hopefully a pic later to day to show one side finished.
          Mike.

          Comment

          • scottie3158
            SMF Supporters
            • Apr 2018
            • 14201
            • Paul
            • Holbeach

            #230
            Michael,
            Bravo mate that is a superb piece of the modellers art.

            Comment

            • Scratchbuilder
              • Jul 2022
              • 2689

              #231
              Update.
              The first bridge half is now hours near to completion. :relieved:
              I have added most of the track side guards, with two to go on this half of the bridge.
              Click image for larger version

Name:	20230325_165701_HDR.jpg
Views:	1
Size:	4.6 KB
ID:	1197478
              Below is a pic of the parts that go to make up one section..
              Click image for larger version

Name:	20230325_165542_HDR.jpg
Views:	1
Size:	4.2 KB
ID:	1197479
              So you have the section itself, below that bottom right are the uprights, above and to the right are the four spacers, then on their left are the rear parts of the clamp that fit across from the rear of the section and over the edge of the flat strip. To their left are the same, but these wrap around the outside edge, and finally there are the 0.8mm nuts that attach the clamps (in real life).

              Here is the bridge now at its full height...
              Click image for larger version

Name:	20230325_165804_HDR.jpg
Views:	1
Size:	5.3 KB
ID:	1197482

              And at its full length, with a Chieftain to give it some scale...
              Click image for larger version

Name:	20230325_165908_HDR.jpg
Views:	2
Size:	5.4 KB
ID:	1197483
              And now for a lay down in a dark room.... Only another half to go...
              Cheers
              Mike.

              Comment

              • Guest

                #232
                I think I’ll wait for somebody to make this as a complete plastic kit

                Although, for the Centurion bridgelayer I would most likely build, there already is. It “just” needs combining a Centurion hull with an M48 AVLB mechanism and bridge …

                Comment

                • Scratchbuilder
                  • Jul 2022
                  • 2689

                  #233
                  Originally posted by Jakko
                  I think I’ll wait for somebody to make this as a complete plastic kit

                  Although, for the Centurion bridgelayer I would most likely build, there already is. It “just” needs combining a Centurion hull with an M48 AVLB mechanism and bridge …
                  Sorry Jakko,
                  Different bridge dimensions and build, and different launching mechanism.
                  But, like all things scratch built and London busses, you wait for one and along come three... M113, scratch built - Tamiya brought out theirs... M577A1 based on the M113, again scratchbuilt one, and Tamiya brought out theirs. Another modeller I knew came out with the M10, you can guess what happened. Although I must admit it has taked a few decades to finally get the M114 in plastic...
                  Mike.

                  Comment

                  • Guest

                    #234
                    Originally posted by Scratchbuilder
                    Sorry Jakko,
                    Different bridge dimensions and build, and different launching mechanism.
                    That’s what I meant If I were to build a Centurion bridgelayer it would most likely be the Dutch Army version, that differs as you say.

                    Originally posted by Scratchbuilder
                    Although I must admit it has taked a few decades to finally get the M114 in plastic...
                    I bought the Accurate Armour M114 (second hand) years ago but haven’t built it yet. Oh, and I have their FV 432 as well, and bought their Strv 103 a few months before Trumpeter released theirs. I did kind of wonder why they (AA themselves, at EuroMilitaire) charged me 10% less than the list price on it at the time …

                    Comment

                    • Scratchbuilder
                      • Jul 2022
                      • 2689

                      #235
                      Update,
                      The work on the bridge has been a bit hit and miss at the moment with having to do other things, house type things etc...
                      But we are progressing and can see the light at the end of the tunnel - or is that the bottom of the JD bottle....
                      Anyway...
                      Click image for larger version

Name:	20230416_100924_HDR.jpg
Views:	1
Size:	4.9 KB
ID:	1199693
                      #3 section in the jig....
                      Click image for larger version

Name:	20230427_091454_HDR.jpg
Views:	1
Size:	5.0 KB
ID:	1199694
                      ... and now getting ready for the side guides to be put on....
                      So more later when I should be on #4 section.
                      Cheers
                      Mike.

                      Comment

                      • JR
                        • May 2015
                        • 18273

                        #236
                        Originally posted by Scratchbuilder
                        Update,
                        The work on the bridge has been a bit hit and miss at the moment with having to do other things, house type things etc...
                        But we are progressing and can see the light at the end of the tunnel - or is that the bottom of the JD bottle....
                        Anyway...
                        [ATTACH=CONFIG]n1199693[/ATTACH]
                        #3 section in the jig....
                        [ATTACH=CONFIG]n1199694[/ATTACH]
                        ... and now getting ready for the side guides to be put on....
                        So more later when I should be on #4 section.
                        Cheers
                        Mike.
                        That's a build in its self Wibble .

                        Comment

                        • scottie3158
                          SMF Supporters
                          • Apr 2018
                          • 14201
                          • Paul
                          • Holbeach

                          #237
                          Mike,
                          Superb as always.

                          Comment

                          • Neil Merryweather
                            SMF Supporters
                            • Dec 2018
                            • 5185
                            • London

                            #238
                            Those bridge sections are absolute monsters! And to have to build four of them... Top marks and hats off sir!

                            Comment

                            • The Smythe Meister
                              • Jan 2019
                              • 6248

                              #239
                              Just caught u with this and gotta say..... WOW!!
                              That's one inspiring bit of bridge building,looks superb

                              Comment

                              • Scratchbuilder
                                • Jul 2022
                                • 2689

                                #240
                                Many thanks for all the comment, most appreciated.
                                Mike.

                                Comment

                                Working...