Update,
Just a few more pics of the progress....

Work has started on the side stowage rails, I replaced the kit offerings with brass etch attachment brackets (Voyager M-109) and the rails with 1mm aluminium tube, two more brackets to add this side.... And nearly forgot the new filler cap....

Left side completed with the 'bucket' stowage for the cleaning rod. bracket for holding spare track links and clamps complete with new 'butterfly' fasteniers for the tow cable.

Then it was back to the turret to start finalising the outside. First come the two front stowage baskets, above is the left hand one waiting to be cleaned up and then have the ammo box rack and the jerry can holder added....

This is the right side one attached showing the jerry can holder....

And this is the tool holder at the front, just got the pin and chain to add to the top bracket.
And that is it for now
Cheers
Mike.
Just a few more pics of the progress....
Work has started on the side stowage rails, I replaced the kit offerings with brass etch attachment brackets (Voyager M-109) and the rails with 1mm aluminium tube, two more brackets to add this side.... And nearly forgot the new filler cap....
Left side completed with the 'bucket' stowage for the cleaning rod. bracket for holding spare track links and clamps complete with new 'butterfly' fasteniers for the tow cable.
Then it was back to the turret to start finalising the outside. First come the two front stowage baskets, above is the left hand one waiting to be cleaned up and then have the ammo box rack and the jerry can holder added....
This is the right side one attached showing the jerry can holder....
And this is the tool holder at the front, just got the pin and chain to add to the top bracket.
And that is it for now
Cheers
Mike.
Comment