Kit box art ,no boring spru shots but it was full of yellow plastic.
Got as far as lower running gear no big shakes here just the usual snip and glue
So next up was the tracks.
Make a 168 units comprising 2 parts per link
168 links with 2 sprue gates per link=336 gates to be snipped/cut
168links with 2 clean up points = 336 clean ups
168 track teeth with 1 sprue gate = 168 gates to be snipped/cut (though these were easily removed from spru with a scalpel)
168 track teeth with 1 clean up point = 168 clean ups
Then build the links allowing 84 per side(set of tracks)
So a 168 teeth to be fixed to 168 links with 2 cement fixing points per link = 336 points to glue ,I took the tooth to the glue then the tooth to the link
Yippee the last one
Two sets of 84 ready to go. Its not as bad as it seem get a little method/rhythm going got it done in two sessions takes longer to prep all the pieces glueing themselves the easy bit. Dave
Comment