I did some of this work in parallel w/3" AT gun & track. Step one photos got lost. Step one was boring clean-up, scraping, carving, adding tow hook, window glazing, initial priming & paint and fitting a driver to the seat.
Step 2 is test fitting wheels/axles & assembling the interior to the cab. Both trucks are being worked together.
[ATTACH]308990[/ATTACH]
Step 3 working axle positions to allow some flexibility.
[ATTACH]308991[/ATTACH]
Step 4 install wheel/axle assys., drill holes and install splines for a better connection between sub assys.
[ATTACH]308997[/ATTACH]
Step 5 drill holes for ROCO side view mirrors, install grills & front bumper/winch assys. Assemble sub assemblies.
[ATTACH]308999[/ATTACH]
352s almost done-starting clean-up on 105s & gathering details for same.
[ATTACH]309000[/ATTACH]
PaulE
Step 2 is test fitting wheels/axles & assembling the interior to the cab. Both trucks are being worked together.
[ATTACH]308990[/ATTACH]
Step 3 working axle positions to allow some flexibility.
[ATTACH]308991[/ATTACH]
Step 4 install wheel/axle assys., drill holes and install splines for a better connection between sub assys.
[ATTACH]308997[/ATTACH]
Step 5 drill holes for ROCO side view mirrors, install grills & front bumper/winch assys. Assemble sub assemblies.
[ATTACH]308999[/ATTACH]
352s almost done-starting clean-up on 105s & gathering details for same.
[ATTACH]309000[/ATTACH]
PaulE
Comment