Nearly completed the workbed ........................


A problem is the lack of any really positive location points for the side frames - there are shallow holes on the decking & very shallow pins ( more like pimples ) on the frame mounts. It would be a great help to drill these out & replace them with small metal ( brass? ) pegs to give a good register. I spent about 30 minutes fiddling, when, If there was an absolute location, it would only take 5 minutes.
There are still a few bits to add, more stowage boxes, but nothing too major.
After that will be the bucket wheel - it has 15 build stages, some of which won't be understood until I actually dry fit them!
Dave
A problem is the lack of any really positive location points for the side frames - there are shallow holes on the decking & very shallow pins ( more like pimples ) on the frame mounts. It would be a great help to drill these out & replace them with small metal ( brass? ) pegs to give a good register. I spent about 30 minutes fiddling, when, If there was an absolute location, it would only take 5 minutes.
There are still a few bits to add, more stowage boxes, but nothing too major.
After that will be the bucket wheel - it has 15 build stages, some of which won't be understood until I actually dry fit them!
Dave
Comment