Scale Model Shop

Collapse

Modelling Time

Collapse
This topic is closed.
X
X
 
  • Time
  • Show
Clear All
new posts
  • Guest

    #1

    Modelling Time

    Looking at some of the completed models on the site and the amount of fantastic detail on each of these, I was wondering just how much time we all spend a week or a day on our hobby. I realize some may be retired and have a little more available spare time but just an idea would be nice.
  • Guest

    #2
    I model pretty much everyday.


    If I'm painting a 120mm scale figure it can take anywhere between 20/40 hours depending on complexity.


    They are usually completed within a 2 week time frame.


    I average 30/40 models a year..

    Comment

    • Guest

      #3
      In complete contrast to Ralph, I manage 3-4 models a year! :P ok maybe a few more, but it's definitely a slow process. Although I always get more done in the winter

      Comment

      • Guest

        #4
        I'm like Patrick....3 or 4 models per year


        For a diorama I need about one entire year (or more)....


        Anyway this year I don't built many models....hope will be better the next one :P

        Comment

        • rickoshea52
          SMF Supporters
          • Dec 2011
          • 4076
          • Rick

          #5
          I model in slow time, for example, Ralph is knocking out his 1/72 F-14 in a week or two whereas I started mine in January...but only have the pitot probe left to fit. I travel overseas a lot and have two young children that curbs my modelling time. If only a lottery win would come my way then I'd retire and finish all those kits in the stash....aye right!
          On the bench: Airfix 1/48 Sea King HC4, Revell 1/24 Trabant.
          Coming soon: Airfix 1/72 Phantom FGR2.
          Just finished: Airfix 1/48 Stuka & Airfix 1/72 Sea King HC4.

          Comment

          • PaulTRose
            SMF Supporters
            • Jun 2013
            • 6473
            • Paul
            • Tattooine

            #6
            for me it comes down to what shift im on at work


            when im on days i tend to have an hour-ish in the evening


            when im on nights i also tend to have an hour-ish in the evening before going to work


            when im on lates, and therefore have mornings free i tend to have no enthusiasm so dont bother


            weekends i try and slip away to the bench as/when i can


            unwritten rule in this house......as soon as x factor or britains got talent comes on the telly im gone and i dont come back til the playout music comes on
            Per Ardua

            We'll ride the spiral to the end and may just go where no ones been

            Comment

            • Guest

              #7
              I too only finish about 4 builds a year. On average, I guess that's about 5 hours a week. I could find more time, but I'm interested in a lot of other things too. I'm expecting an increase in production later next year when I retire.

              Comment

              • stona
                SMF Supporters
                • Jul 2008
                • 9889

                #8
                I work away from home. I can't usually do any model making unless I'm at home. A busy year, as I've just had, means minimal time and output. Now I'm home I try to get a couple of hours a day in, sometimes more.


                Cheers


                Steve

                Comment

                • Guest

                  #9
                  I do about 5-6 hours daily.

                  Comment

                  • colin m
                    Moderator
                    • Dec 2008
                    • 8759
                    • Colin
                    • Stafford, UK

                    #10
                    In a week, not that much time. However, yearly, this year, I'm in for finishing 5 which is my all time best record, I think ?

                    Comment

                    • Adrian "Marvel" Reynolds
                      • Apr 2012
                      • 3008

                      #11
                      I quit my job earlier in the year so had plenty of time to crack on modelling, with my new job I'm normally done by 2pm so after a bite to eat its onto the bench for 7-8 hours.


                      All of which means I have managed to finish 18 builds so far this year with number 19 due by the end of the week


                      Adrian

                      Comment

                      • Bigfoot57
                        SMF Supporters
                        • Jun 2015
                        • 1101

                        #12
                        I manage a couple of hours per day at best but it still takes me ages to build anything so again 4 to 5 per year in a good year and probablly only 1 or 2 in a normal year this year for instance I finished Lewis Hamiltons partwork McClaren and 3/4 finished a launch umblical tower for 1/96 Saturn V


                        Colin

                        Comment

                        • grumpa
                          • Jan 2015
                          • 6142

                          #13
                          Though I am retired it seems I can never find enough time to do as much modeling as I would like. I may manage a few hours a week. A lot depends on mood, my back {degenerative disc disease}


                          and a whole host of other distractions and necessary chores. Now that winter is almost here apart from keeping the fires going I usually have more time to model...............Jim

                          Comment

                          • Guest

                            #14
                            I try to get a couple of hours in per evening but if im not in the right frame of mind a model can sit there for days without anything being done to it. The one im on now I recon it will take about 6 months as I want it to be perfect which is a big ask for me

                            Comment

                            Working...