    An update, progress so far.

    I have moved my modelling stuff and most built models into the room.

    I have booked a man about the carpet, an electrician, a decorator and someone to measure up for blinds. All the above will be sorted by the 12th September.

    I won’t be buying the benches and shelving until the decorating, power points and carpet are done but I have identified and priced what I need.

    [ATTACH]432348[/ATTACH][ATTACH]432349[/ATTACH]

    On a broader front my biggest problem is that the kitchen won’t be installed until January. It’s all agreed. It won’t stop me moving in but I won’t have a washing machine until then or a decent fridge. I will have to make do and I am looking for a laundering service.
    Attached Files

    Comment

    • boatman
      SMF Supporters
      • Nov 2018
      • 14497
      • christopher
      • NORFOLK UK

      #47
      Originally posted by BarryW
      An update, progress so far.

      I have moved my modelling stuff and most built models into the room.

      I have booked a man about the carpet, an electrician, a decorator and someone to measure up for blinds. All the above will be sorted by the 12th September.

      I won’t be buying the benches and shelving until the decorating, power points and carpet are done but I have identified and priced what I need.

      [ATTACH=CONFIG]n1158325[/ATTACH][ATTACH=CONFIG]n1158326[/ATTACH]

      On a broader front my biggest problem is that the kitchen won’t be installed until January. It’s all agreed. It won’t stop me moving in but I won’t have a washing machine until then or a decent fridge. I will have to make do and I am looking for a laundering service.
      Youre getting there barry an it will be nice to see you start your build again eh
      chris

      Comment

      • Nicko
        SMF Supporters
        • Apr 2019
        • 1410
        • Nick
        • East Anglia

        #48
        Other than the kitchen Barry it all seems to be moving forward pretty quickly.

        Nick

        Comment

        • BarryW
          SMF Supporters
          • Jul 2011
          • 6028

          #49
          It is amazing just how much you can get in that double wardrobe. Almost everything out of the way of the carpet fitters and decorators. Just a couple of models I could not get in and six left to transport.
          [ATTACH]432377[/ATTACH]

          This is all that’s left outside the wardrobe.
          [ATTACH]432378[/ATTACH]
          Attached Files

          Comment

          • BarryW
            SMF Supporters
            • Jul 2011
            • 6028

            #50
            The electrician has been in today.

            He finished the lounge and bedroom and done the worse part of the modelling room. He will finish that and kitchen tomorrow.

            This is how the modelling room looks now.

            [ATTACH]432655[/ATTACH]

            You can where I am having some outlets above the desk and Hobby Zone modules. The spray area is at the other end of the window.
            Attached Files

            Comment

            • BarryW
              SMF Supporters
              • Jul 2011
              • 6028

              #51
              The flat is being decorated this week. I doubt that the flooring will be down though for a week or two. As soon as the flooring is down it will be full steam ahead.

              Comment

              • JR
                • May 2015
                • 18273

                #52
                Originally posted by BarryW
                The electrician has been in today.

                He finished the lounge and bedroom and done the worse part of the modelling room. He will finish that and kitchen tomorrow.

                This is how the modelling room looks now.

                [ATTACH=CONFIG]n1158553[/ATTACH]

                You can where I am having some outlets above the desk and Hobby Zone modules. The spray area is at the other end of the window.
                Nice and neat chasing Barry, these days with a modern channel cutter with full dust control long gone are the days of mess and cracked plaster.

                Comment

                • BarryW
                  SMF Supporters
                  • Jul 2011
                  • 6028

                  #53
                  Thanks John.

                  Here is how it is now. Currently I am in awaiting Curry’s to fit a 65 inch tv on the lounge wall along with the surround system. The decorators are in again later as well but the lounge and bedroom are the priorities as I want to move in by next Monday. Not sure about when the carpets will be fitted, hopefully not long.

                  [ATTACH]433035[/ATTACH]

                  In a way the whole flat will be a bit of a man-cave with the lounge being a home cinema… I will try not to make the bedroom and lounge overly masculine though, as I don’t want lady visitors to be uncomfortable….
                  Attached Files

                  Comment

                  • Mark1
                    • Apr 2021
                    • 4156

                    #54
                    Originally posted by BarryW
                    Thanks John.

                    Here is how it is now. Currently I am in awaiting Curry’s to fit a 65 inch tv on the lounge wall along with the surround system. The decorators are in again later as well but the lounge and bedroom are the priorities as I want to move in by next Monday. Not sure about when the carpets will be fitted, hopefully not long.

                    [ATTACH=CONFIG]n1158859[/ATTACH]

                    In a way the whole flat will be a bit of a man-cave with the lounge being a home cinema… I will try not to make the bedroom and lounge overly masculine though, as I don’t want lady visitors to be uncomfortable….
                    A couple of scatter cushions, job done!

                    Comment

                    • BarryW
                      SMF Supporters
                      • Jul 2011
                      • 6028

                      #55
                      Just got a date for the carpets to be fitted, next Tuesday 14th September.

                      So, once that's done I will order the benches and display shelves. A resumption at the bench is in sight....

                      Comment

                      • BarryW
                        SMF Supporters
                        • Jul 2011
                        • 6028

                        #56
                        Decorating done

                        Carpet Tuesday.

                        This is how the room looks now.
                        [ATTACH]433534[/ATTACH]
                        Attached Files

                        Comment

                        • Jim R
                          SMF Supporters
                          • Apr 2018
                          • 15709
                          • Jim
                          • Shropshire

                          #57
                          Hi Barry
                          Looking good. Once the carpet is down you can concentrate on the 'stuff' directly relating to building your models. Perhaps the more exciting jobs from now on.
                          Jim

                          Comment

                          • scottie3158
                            SMF Supporters
                            • Apr 2018
                            • 14208
                            • Paul
                            • Holbeach

                            #58
                            Coming together nicely mate. If all those sockets are on together you better check the street lights don't dim lol.

                            Comment

                            • BarryW
                              SMF Supporters
                              • Jul 2011
                              • 6028

                              #59
                              Originally posted by scottie3158
                              Coming together nicely mate. If all those sockets are on together you better check the street lights don't dim lol.
                              LOL. All professionally installed and all will carry a lowish load. For instance, a light and extractor booth will run at the same time, occasionally the compressor will kick in and a paint mixer but the latter never at the same time as the compressor. A light may be left on over the workbench as well, of course. Nothing is a heavy load and that number of electrical points is more about convenience. The flat is very well heated by gas.

                              Comment

                              • JR
                                • May 2015
                                • 18273

                                #60
                                That's the messy side done then Barry, now on to the fun side. Enjoy.