If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
Well, this month I wasn't able to get as far as I would've liked to. I had several things I had to redo on the Enterprise model before I could start the wiring. I needed to add the Hanger bay doors to the back of the ship so they are in the open position. I also added a few more lightis to the hanger bay to enhance their lighting effects. But my primary task was to make sure that I was able to get the Armature mounted into the sauce and also make sure it would hold the ship up without bendig or bouncing too far up and down. The Enterprise does have some weight to it so I wanted to make sure the armature was holding the ship at an even keel. I also needed to start the wiring and have it feed through the armature up into the Drydock and down to the control panel base. This is now easy task as there are many wires to run through the ship. If this was mounted from below on the engineering deck it would a lot easier. But this ship needs to appear to be floating inside the dock and this is the only way to do it.
So I spent most of this last month doing a lot of soldering and wire running. Then after the wires were run thorugh the armature I needed to test that the ligthting circuits were working, then lable all of the wiring and the voltage for it's final connections to the power sources. So, I got the Engineering section wired up as well as most of the upper and lower saucer pieces. I am waiting for a shipment of LEDs to complete the thruster wiring for the Main deflector housing. I was able to get the main deflector dish wired up and working. I have lighting tests pics for some of the ship's lighting. By next month's update I will have the Enterprise resting inside her drydock and then I can add the Port side of the dock to the model. Hang in there gang. It's getting closer to being finished. I have 16 pics int the May Updates page. Check 'em out and enjoy! See you next month.
It's good to be back! We just came back from a week long cruise to the BAHAMAS! A much needed and relaxing vaca! Enough to recharge batteries and enthusiasm to get back to the task at hand.
Anyway, I was going to set up the June updates before I left, but I ran out of time, so here we go....
I needed to wait for some other parts for the model so I had to divide my time on working on the gangway/interface/armature and the port side detailing on the panel frames.
I first had to feed all of the wiring through the armature and feed it up to the top of the armature so I could add the gangway and tower details around the wiring. This will hide all of the wiring and make it appear as though the ship is under it's own power. I built the gangway on this version of the model the same way I did it for the 1/350 scale version of the model. I first started at the hull of the saucer section and work my way out to the tower section then build the actual tower section on three sides and detail it. By only building it up on three sides allows me to add any last minute additional wiring that might be needed. When I'm sure I won't need to add anything I can then seal all of the wiring in and paint all of the details. I was also able to add the three hydraulic lines that are seen in the movie. I used an enhanced screen cap to follow how these lines hang on the sides of the gangway.
In other areas I've added the lower tier mark lights as well as the port side mooring tractor beam turrets. So more soldering and wiring were needed. Also, I began working on the tension rod assemblies for the port side panel frames. I started with the mounting nuts then added the washers and bolts then cement the turnbuckles into place. Next I cement only one end of the tension rod into one end of the turnbuckle and leave the other end to slide in and out of the turnbuckle. This helps keep the rods from bending when I assemble the panel frames to the overhead modules when the weight of the structure shifts.
The last pieces I've worked on in the last month are the outside panels that are seen when the Enterprise takes off from the Dock. I just added some small details. I put some c-channel pieces as well as some tanks on either side of the c-channels. I will be adding an LED to each of these panels later on to add some more lighting effects to the outside of the panel frames. Well, now that vacation is over with, it's back to work on all counts! Enjoy the pics in which there are 12 new ones on the Updates for June - 2015 page! See you in a month!
Hey! Thanks Guys! I'm glad you're liking what you're seeing. Currently I'm assembling more of the tension rods and turnbuckles for the side panel frames. It is very tedious work. In my next updates I'll try to show what's entailed in this part of the assembly. Keep checking for the updates. Should be ready in about 15 days or so. See ya then!
As a kid I dreamt of building special effects models for the movies, but over time CGI has replaced this art form, that you and the creators of Thunderbirds, Star Wars, Star Trek, etc were and are doing!!
This month's updates are now posted for your enjoyment. I have pretty much been doing a lot of clean up with the port side framework. I'm getting all of the tension rod assemblies in place as well as the port side mark light bars which run along the length of the model. I've also added all of the panel frame details to the sides of each of the panel frames. Everything is pretty much in place and all I have to do now is connect all of the wires and do a lighting test to make sure everything works okay. The only part I didn't detail as of yet is between the top tier 2nd and 3rd panel frames. This is because I will have to cut into the tubing to allow the armature tower to fit in between these panels. I'm a little bit nervous about cutting into these tubes just because I don't want to ruin anything. But this has to be done in order for the ship to be supported inside the dock.
In the meantime, I will be painting up all of the added details that I've put on this last month to match the rest of the dock model. In the updates there are 32 new pics for this month. I've taken more photos to show how the tension rods are added one by one into the structure. It takes about 40 to 45 minutes to complete one panel frame. This is mainly because of all of the small parts I'm using to build this part of the dock. I can't tell you how many times I've wound up dropping parts while trying to put them all in place. I've also been doing some piece counting for the model. There are 9 parts to each of the tension rods. 2 mounting nuts, 2 mounting bolts, 2 washers 2 turnbuckle sleeves and one tension rod. There are 12 tension rods on each panel frame. So just for the tension rod assemblies alone there are 108 pieces per panel frame. 42 panel frames total including the port and starboard frameworks. This equals 4,536 individual pieces just for the panel frames alone. At the end of the entire build I will give you a complete total of all the individual parts needed for this model.
In other areas, I have scratch built some support clamps that are needed to hold the mark lighting rods in place on the outside of the port framework. These clamps were all cemented to the outside of the dock and aligned so that the entire length of the rod would appear straight over the entire length of the dock. The mark light rods are then snapped into the clamps holding them in place. Next I will be doing the wiring for these lights and then do a light test. After everything looks good I can then paint all of these parts to match the dock. I can finally move to get the Enterprise in place. Hope you enjoy all of the pics for this months. As always if you have any comments or questions I'd be happy to hear from you. See you next month! Be safe!
I apologize for the delay with this month's updates. A lot going on in my life, lately! Whew! I finally am able to post the update! Anyway, Most of the past month I've been painting all of the turnbuckle assemblies on the inside as well as the outsides of the frames. No easy task considering they needed to be done one part at a time. Some parts needed more than one coat. I would have preferred to airbrush all of this but the masking would be too time consuming and the parts are way too fragile to keep in place. There are too many details on the light panels to worry about overspray and the like.
I have 9 new pics in the August Updates - 2015 page. This shows the painting completed. I've also added the cryo-tanks to the bottom tier of the frames and those are now secured in place as well. About half of the pics are some light test shots. The only other thing I was able to work on are the outside "B" panels. I've added a few more details to each of them. That's pretty much it for this month, now let's get that STARSHIP inside the dock and launch this puppy!
I Apologize for the lack of updates for September, but Life Happens! Mom's been in the hospital and a nursing home for the last Month and a half, I'm getting ready for a move and everything has been very hectic this past month - (phew)
The little I've been able to get done however is in the October Updates 2015 page. I found out that the pieces I cast for the Roof section of the overhead modules were apparently not thick enough to hold a flat shape. Some of them have warped a tiny bit, so instead of recasting all of them I had some pieces of c-channel left over from when I made the frames of the overhead modules and decided to use them for trusses to help keep any of the other panels from warping. The trusses are held in place with 2 screws. The trusses have also stiffened up the entire frame of the roof sections so it all worked out for the better on this build.
So I was able to paint up the top sides of all the roof panels the overall RUST color to match the rest of the dock. All of the panels are connected to the L-strips of aluminum so they can be dropped onto the overhead module assembly as well as be removed for any maintenance or additional details that need to be added to the module assemblies. There are 7 new pics for this month update. I know that's a little weak on what was accomplished in the last couple of months, but now I can get back to the normal work routine of this build. Once again I apologize for the lack of updates, but I'll have more to come for next months updates. Thanks for the patience and I'll see you next month!
Comment