This is the one that i did for the 2014 super SIG but it badly needs a refurbishment and repaint and what I will be doing is replacing the last of the scratch built prices with the proper ones and also the rigging,and putting in the portholes as from the pics you can see there aren't any.
A Titanic tidy up
Collapse
This topic is closed.
X
X
-
Tags: None
-
This is the kind of thing that I will be doing the top pic shows the scratch built wing bridge on the right and the nearly complete replacement the bottom one is the complete replacement ready to fit
-
Here is more on my tidy up /restoration this time I have rebuilt the docking bridge the top pic once again is the scratch built one and the bottom one is the rebuilt one
Comment
-
Next up on this rebuild is to replace the side piece under the promenade deck the port side has been done so the next up will be the starboard side.
But still to have the portholes drilled out
Comment
-
Guest
-
Here's more on my Titanic tidy up so far today i had to replace some planking at the bow and now started on the portholes witch come in three sizes 1.2 1.5 and 2mm
Comment
-
Well for what seemed ages drilling and placing in portholes they are now finished i still have a few bits to do before painting
Comment
-
Guest
-
Here's my next installment the paint work and portholes has now been completed and I have now started on replacing the rigging as the last pic show the contrast between the old rigging in the fore ground and the new in the back ground
Comment
-
Guest
hello
well was lovely work ,my favorite and first project 2010 a fine tribute you're work good on you !!Comment
-
-
Comment
Comment