Some Further Progress
Tower
Start of tower motor cover:
Cover assembled:
Initial test-fit in assembled cover:
Motor cover housing painted and temporarily test-fitted:
Ventilation
Overall view of beginning of main ventilation duct, made from saved ("pack-ratted") Foley bed-bag drain tube, painted with Americana Slate Gray acrylic:
Passage through galley, with aft locker temporarily located.
General starboard-side view:
Temporarily parked on the living room VHS shelves:
Those were done over the past few weeks. Need to draw the plan for the galley stoves, and still need to work on brass fixtures for the "lamps."
Going slowly, but my physical strength is beginning to improve.
Regards, John
Tower
Start of tower motor cover:
Cover assembled:
Initial test-fit in assembled cover:
Motor cover housing painted and temporarily test-fitted:
Ventilation
Overall view of beginning of main ventilation duct, made from saved ("pack-ratted") Foley bed-bag drain tube, painted with Americana Slate Gray acrylic:
Passage through galley, with aft locker temporarily located.
General starboard-side view:
Temporarily parked on the living room VHS shelves:
Those were done over the past few weeks. Need to draw the plan for the galley stoves, and still need to work on brass fixtures for the "lamps."
Going slowly, but my physical strength is beginning to improve.
Regards, John
Comment