I've managed to get some work done on the layout finally but I want to show how the lower mainline tracks were last year.
And this is how they are now because I need to have the second incline on the inside from the upper level so it can join back up to the lower track.
And now for work that has been done this week.
First I wanted to lengthen the incline to the upper level by two feet.
I also fitted two point motors to the points that enter the hidden tracks on the far side of the layout.
And two more Point motors two these two points.
And the motors fitted to the points.
Tomorrow I will be mainly cleaning the loft up and then when I get back on my Hols I will wire all the lower point motors up to the control panel which I still have to build.
And this is how they are now because I need to have the second incline on the inside from the upper level so it can join back up to the lower track.
And now for work that has been done this week.
First I wanted to lengthen the incline to the upper level by two feet.
I also fitted two point motors to the points that enter the hidden tracks on the far side of the layout.
And two more Point motors two these two points.
And the motors fitted to the points.
Tomorrow I will be mainly cleaning the loft up and then when I get back on my Hols I will wire all the lower point motors up to the control panel which I still have to build.
Comment